Is it really fine to leave junction boxes buried behind drywall or should we all be pulling them to the surface?

I keep seeing guys on new builds in Dallas just drywalling right over junction boxes with splices inside, and my old master always said that's a code violation waiting to bite someone, but then others argue it's common practice if the box is accessible before the sheetrock goes up so which side is actually right here?
3 comments

Log in to join the discussion

Log In
3 Comments
pat_schmidt60
Just surface mount them after inspection, saves everyone a headache later.
6
rowan725
rowan72520d ago
Right there with you, Pat.
3
abbyg14
abbyg1421d ago
That's just lazy work. Code says accessible means accessible.
5