Pro tip: the rigger in Houston told me to watch the load line, not the load, and it clicked
Was spotting for a guy setting trusses last Thursday and he kept hollering at me to watch the line instead of the truss. Took me a few picks to get why. Once I started watching where the line ran through the sheave I caught a rub on the boom tip before it got bad. Cut maybe 20 minutes of downtime and probably saved a cable. Any of you run it that way or do you stay locked on the load?