Picked the smaller 60-ton over the 90-ton for a tight lift in Gary and I'm still second-guessing it
Last week I had a job at a steel mill in Gary where the setup spot was so tight I could barely swing the counterweight, so I had to choose between our 60-ton and the 90-ton. I went with the 60 because the 90 would've needed a longer boom to clear the building and honestly I didn't trust the ground near those old foundations. The lift went fine, but the chart put me at 88% capacity and my hands were sweating the whole time. Now the foreman keeps saying we should've brought the big crane anyway and it's eating at me. Any of you ever regret going with the smaller machine just to stay out of a tight spot?