Warning: the site trailer at the Parker job had three tablets in a docking bay and none would hold a charge past lunch | Construction Tech Tools - Opinions Matter
Warning: the site trailer at the Parker job had three tablets in a docking bay and none would hold a charge past lunch
Stopped by to drop off drawings and the super was fighting with a battery bank plugged into a generator that keeps tripping. He has guys logging daily reports on paper again because every screen dies by noon in the heat. Anyone found a charging setup that actually survives a 100 degree day on a jobsite?