Field tablet died at the worst possible moment on a Bridgeport jobsite
We were doing final punch list walkthroughs on that 14 unit apartment build in Bridgeport last Thursday and my rugged tablet just black screened right as I needed to pull up the electrical as-builts. Foreman had to drive back to the trailer for the paper set, cost us 45 minutes. I have been relying on that thing for everything since we went paperless in March. Anyone else had a critical device fail mid inspection and switch back to a backup method?