PSA: My 6 inch slump cost me a whole driveway pour and a Saturday
We poured an 18 by 24 slab out in Clinton last Saturday and it started going south about 40 minutes in. The mix came off the truck wetter than we called for and we never checked the slump, just went straight to screeding like we do every week. The edges started slumping and by the time I got the floats on, water was pooling around the forms and I had a 3 inch drop at the low corner. We ended up cutting a control joint right into it and praying, but the homeowner saw the mess before we finished and wants it torn out. I know I should have rejected that load at the chute, but the driver was pushing us to pour and the crew was already set up. What do you all do when the truck shows up hot and you've got a crew standing around on the clock?