My screed went sideways on a 24x30 garage slab in Topeka and I caught it 15 minutes too late
Pouring a 24x30 garage slab in Topeka back on the 4th, and the screed started tearing the edge about 10 feet in because the mix was a touch wet. I had two guys on the bull float already so nobody wanted to stop and add water, and I stood there watching the cream pull away from the rock. We ended up working it back with a mag float, but a 3 foot patch along the control joint dried with a visible drag mark. Customer hasn't said a word yet, but I know it's there. Has anyone found a trick to slow a hot mix down on a windy day, or do I just eat this one?