Shoutout to the super at the Riverside job in Boise who told me to stop caulking over wet primer
I kept blaming the caulk for pulling away on exterior joints, but he pointed out I was laying it down 20 minutes after the primer went on. He said wait a full day, not the 2 hours on the label, and every joint has held since. Three callbacks on that building and it was my own fault the whole time. Has anyone else had primer cure times bite them like that?