Rant: last month's bid on a Hattiesburg retail build came back $14k under my number
Put together a bid last month for a small retail buildout in Hattiesburg and felt good about it until the GC read out the other quotes on the call. One guy came in $14k under me on the same plans, same scope, and he was not even a low-overhead shop. I walked through my numbers line by line after that and the only real gap was how I priced the electrical rough-in. So now I am wondering how many of these jobs I am losing to a number that does not hold up once the change orders start. Has anyone figured out a clean way to check a competitor's price without asking to see their sheets?