PSA: I switched our site trailers from wood to composite decking and spent $1,800 more than I planned
Figured I'd share this since it caught me off guard. Back in March we built out four new site trailers for a job over in Gary and I talked the boss into composite decking instead of the usual treated lumber, mostly because I was sick of re-staining our old ones every year. Material bill came in at about $1,800 over budget on the four, which I expected, but what I didn't expect was how much slower my guys moved putting it down. The stuff is heavier per board and you can't just rip it fast with a dull blade, so a deck that used to take a day took a day and a half easy. Six months in though the trailers look brand new, no splintering, no boards cupping, and the crew stopped bitching about slivers. Now I'm trying to decide if it's worth running composite on the next batch or if I just got lucky on this one. Anybody here been using composite long enough to know how it holds up when a trailer sits in the sun for years?