Found out I'd been hanging fire doors with the wrong gap for 4 years
I was on a tenant buildout in Omaha last month and the inspector pulled out his gauge and gave me this long look. Turns out I'd been setting my gaps at a fat 1/8 inch on every door because that's what the old timer who trained me did, but the spec sheet on this job called for 1/8 plus or minus a 1/16, and 7 of my 9 doors were out of whack on the strike side. I stood there doing the math while he wrote it up and realized that the doors I'd always blamed for sticking in summer were probably my own fault the whole time. We ended up pulling all 9 and re-shimming in one afternoon, and the closers finally caught like they were supposed to. The part that stung was the super walking through after and saying the doors were the smoothest in the building. Anybody else learn a spec the hard way from a picky inspector, and did your old training hold up or was it just what somebody's cousin did in 1992?