Picked the belt drive lathe over the gear head for a 40 part run, and I'm paying for it
My old gear head at the shop in Tulsa was down, so I went with the belt drive for a rush job to save the customer two days. Now I'm chasing chatter on every finish pass and wondering if the gear head would've just eaten it, anyone run belt drive on heavier cuts and make it work?