Coolant pump died mid roughing pass on a Wednesday in Fort Wayne and the part got scrapped
Was running a batch of 12 aluminum housings on an older mill and about halfway through the third one the coolant pump just quit. I heard the pitch change before I saw the alarm and by then the cutter had already started to load up. Ended up eating that part and a $340 chunk of stock, and I spent the rest of the shift pulling the pump and clearing chips out of the lines. Has anyone had a pump go like that without warning, or is there a check I should be doing between jobs?