O
4

Pro tip: I think everyone's wrong about using a 4-foot level for everything

Last week on a deck job in Boulder, I watched a guy spend 20 minutes trying to get a perfect read on a 16-foot beam with his little level... when a string line would've shown the whole crown in 30 seconds. Anyone else think we over-rely on that tool?
3 comments

Log in to join the discussion

Log In
3 Comments
richard_dixon
Saw a roofer spend an hour leveling a ridge vent that a chalk line would've fixed in five minutes flat.
5
grantschmidt
Come on, it's just a tool. Sometimes a level is the right tool, sometimes a string line is better. That guy was being stubborn, but it's not some huge industry problem. People get stuck in their ways on every job site.
4
anthonymurray
It's a huge problem that costs money.
7