TIL a grumpy old installer in Tulsa changed how I run every single job
Back in March I was doing a 6 unit apartment rough-in in Tulsa and the guy training me (30 years in the trade) made me redo a whole wall of runs because I had them zipped tight to the studs. He said heat builds up in the jacket when it's pinched, and he'd seen cables fail in 4 or 5 summers where they were strapped hard. I argued it costs more zip ties and time to leave slack, so we went back and forth the whole afternoon. Now I see it both ways: neat and tight looks pro to the inspector, but loose and breathing might save the customer a callback in 5 years. What do you all do, strap it tight or leave a little room?