Showerthought: that coax tester at the Baton Rouge job saved me from trusting my eyes
I used to swear you could eyeball a good fitting and skip the meter, and I got away with it for a long time. Then last spring I was on a 90 unit apartment rough in over in Baton Rouge and decided to meter every drop instead of just the ones that looked off. Found 7 bad connectors in the walls, all of them with clean looking crimps that passed my old eye test without a second glance. Now I meter everything, even the runs I am sure are fine, and it adds maybe 20 minutes to a full day. The guys who say the tester slows them down are not thinking about the callback truck roll that eats half a day. What is your cutoff, do you meter the whole house or just the home runs?