Old timer on a Dallas job told me to stop zip tying to the joist and use a J hook, saved me 15 minutes a drop
Was running cable through this attic in Dallas back in March and an installer named Ray who's been doing this 22 years watched me zip tie to the joists and told me to switch to J hooks instead. Said it would save me time on rough-ins and keep the cable from getting pinched, and he was right, I cut about 15 minutes off each drop on that 80 drop job. Now I keep a box of them in the van but I'm wondering if anyone's had issues with them pulling loose over time. What are you all using for attic runs these days?