DAE realize at a San Marcos job site that labeling both ends of every run saves way more time than you think?
Was on a 3 story house in San Marcos last week running 22 drops with another installer, and we spent close to 2 hours at the box just buzzing out lines with a toner because nothing got labeled. Then the homeowner's sprinkler guy said something about how he marks both ends of every wire before he pulls it, and it hit me. We started tagging each end with a strip of tape and a Sharpie before stuffing anything in the wall, and the second day we had zero guesswork. It cost maybe 15 extra minutes up front and saved us at least an hour of standing around pointing at cables. Now I do it on every job even when the crawlspace is easy. What do you all use to tag, tape or the little clip labels?