Spent 6 hours Tuesday fixing a drawer that was never square to begin with
Last Tuesday I get a call from a client in Portland about a bathroom vanity I installed back in March. One drawer keeps binding, she says. So I drive out there, pull the drawer, and the bank of drawers is out of square by almost 3/16 inch. I check my notes from the build and yep, I built that box on a Friday afternoon after a long week and never checked the diagonals before assembly. So I spend 6 hours pulling the face frame off, squaring everything up, re-gluing, and reinstalling. The part that eats me is I know better. I have a Starrett square hanging right there on the wall and I just did not grab it. Now I measure diagonals on every single carcass, even the little ones, even when I am sure it is fine. What do you all do to keep from skipping the basic checks when you are tired or rushing?