Vent: speed is not the flex some of you think it is
I was on a 3 man crew doing a commercial wall in Dayton last month and the lead kept pushing us to lay 600 bricks a day, so corners got sloppy and the plumb went off about 3/8 inch over 10 courses. I told him flat out I would rather lose the bonus than come back and tear out a wall, so we pulled the last two courses and reset them. Cost us an afternoon but the inspector passed it first look while the other crew on that job got red tagged. Am I wrong for thinking a clean wall beats a fast one every single time?