Serious question, the mortar in my mud board started setting up too fast on a job in Fresno
Mid morning it was 96 degrees out and my mud was stiff within 15 minutes of mixing, so I started mixing smaller batches and keeping the board in the shade. Got through the rest of the wall fine but lost about half an hour of work. Any of you add anything to slow the set in heat, or just mix smaller?
Something worth checking is your water temp, not just the air temp. Water coming out of a hose that sat in the sun can be 110 or hotter, and that alone will cut your set time way down. Fill a bucket the night before and let it sit in the shade, or grab a bag of ice and toss a little in the mix water. It sounds small but I've seen it buy a good ten minutes on a hot day. Cheaper than fighting it with additives.