Got called out on my head joints at a job in Tulsa and it fixed my whole wall
I used to slop the mortar on the head joints and just push the brick tight, figured it was close enough on a 28 foot run. The mason running the crew in Tulsa looked at my course and said "your joints are pinching at the top, that's why your line sags halfway down." He showed me to butter the whole head face and not just the bottom edge, and my line stayed true the rest of the afternoon. I still see guys rushing the head joint on production walls and I get why, but the rework costs more than the extra 10 seconds per brick. Has anyone else had a lead call out a small habit that turned out to matter more than you thought?