Can we talk about signing off a squawk you can't reproduce? A 2 hour bench session in Tulsa got me thinking
Last week a younger tech at our hangar in Tulsa told me he signs off intermittent squawks after 30 minutes of ground runs if nothing shows up, and I pushed back hard. His side is that chasing a ghost burns 2 hours and the plane sits, and our shop rate is $95 an hour, so the owner gets mad either way. My side is that a pitch trim issue that only shows up at altitude put a plane back on the ramp twice before we found a chafed wire behind the panel. So who is being fair here, the tech who clears it so the plane flies, or the one who keeps digging and makes the owner pay? I get that not every squawk is a real fault, but I have seen what happens when we call it good too soon. How do you all handle the gray ones, do you write it up as found no fault, or do you keep the plane until you can prove it?