25
Chat with a frame machine tech last Thursday made me rethink how I prep panels for pulling
He said 'you're leaving 3% of the tension locked in the metal' and showed me his tension gauge readings on a uniside, now I'm wondering how many guys check for residual stress before even hooking up their chains, anyone else ever chase that last millimeter with a torch?
3 comments
Log in to join the discussion
Log In3 Comments
wendy_jackson1mo ago
Hold up, 3%? That's wild. I never thought you could get that fine with a gauge on a uniside before pulling. Makes me wonder how much my panels are fighting back without me even knowing. Did he say what kind of torch work gets that last bit out, or is it just heat and patience?
5
shaneb161mo agoMost Upvoted
Yeah @wendy_jackson that torch work is just heat and patience, nothing fancy.
4
mark_thomas1mo ago
Wait, you're telling me 3% is possible with a uniside?
5